Calculate Lead Time: Flint Fabricated Inc. machine metal parts for the automotive industry. Under the...

70.2K

Verified Solution

Question

Accounting

Calculate Lead Time:
Flint Fabricated Inc. machine metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two process: milling and finishing. Parts are produced in batch sizes of 65 parts. A part requires 4 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7 minutes.
Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 4 parts and the move time is eliminated.
Determine the value added, non-value-added, and the total lead times, and the value -added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal.
Traditional Philosophy. Lean Manufacturing Philosophy
Value-added time. Min. Min.
Non-value-added time. Min. Min
Total lead time. Min. Min
Value-added ratio (as a percent). %. %

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students