Blackwelder Factory produces two similar products-small lamps and desk lamps. The total plant overhead budget is...

60.1K

Verified Solution

Question

Accounting

Blackwelder Factory produces two similar products-small lampsand desk lamps. The total plant overhead budget is $529,000 with540,000 estimated direct labor hours. It is further estimated thatsmall lamp production will require 264,000 direct labor hours anddesk lamp production will need 276,000 direct labor hours.

Using the single plantwide factory overhead rate with anallocation base of direct labor hours, how much factory overheadwill Blackwelder Factory allocate to small lamp production ifactual direct hours for the period is 191,000?

a.$187,180

b.$731,183

c.$366,083

d.$506,000

2)

Blackwelder Factory produces two similar products-small lampsand desk lamps. The total plant overhead budget is $582,000 with471,000 estimated direct labor hours. It is further estimated thatsmall lamp production will require 267,000 direct labor hours anddesk lamp production will need 204,000 direct labor hours.

Using the single plantwide factory overhead rate with anallocation base of direct labor hours, how much factory overheadwill Blackwelder Factory allocate to desk lamp production if actualdirect hours for the period is 178,000.

a.$220,720

b.$507,824

c.$873,000

d.$361,280

3)

Challenger Factory produces two similar products - regularwidgets and deluxe widgets. The total plant overhead budget is$563,000 with 350,200 estimated direct labor hours. It is furtherestimated that deluxe widget production will need 5 direct laborhours for each unit and regular widget production will require 6direct labor hours for each unit.

Using the single plantwide factory overhead rate with anallocation base of direct labor hours, how much factory overheadwill Challenger Factory allocate to regular widget production ifbudgeted production for the period is 75,000 units and actualproduction for the period is 104,800 units?

a.$1,012,368

b.$842,410

c.$93,833

d.$168,482

Answer & Explanation Solved by verified expert
3.7 Ratings (464 Votes)
1 Step1Calculation of single plant wide overhead recovery rate Overhead recovery rate Total overhead costs Total direct labor hours 529000 540000 direct labor hours 098 per direct labor hour    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students