Background: ElonMusk, the man who is responsible for revolutionizing the automotivespace is confused. Why you ask?
He met with Ms. Static whoexplained to him that under the current allocation system,engineering costs amount to $46,880 per Model S and $15,630 perModel X. Elon responds:
"How - Look at the Model X -its freaking awesome and is insanely over engineered. How can itcost leass than our base model?" he decides to hire you as aconsultant to drive transperency into the costs …
Problem: Develop ABC to clearthe mess up
Cost PoolActivity CostsCost DriverDriver
Machine Setup$                      360,000Setup Hours                            4,000
Materials Handling$                      100,000Material (lbs)                          20,000
Utility$                        40,000Kw/hr                          40,000
Information by ProductModel SModel X
Units                             4,000                  20,000
Direct Materials$                        42,000$               54,000
Direct Labor$                        24,000$               40,000
Setup Hours                                200                       240
Materials                             1,000                    3,000
Kw/Hr                             2,000                    4,000
iiWhat / How do you suspect Ms. Static arrived at hernumbers?

Answer & Explanation Solved by verified expert
4.2 Ratings (857 Votes)

(A) (B) (A)/(B)
Activity cost driver Activity cost Driver Overhead Rate
Machine Setup Setup Hours $         3,60,000.00 4000 $                  90.00
Material Handling Material (Lbs) $         1,00,000.00 20000 $                     5.00
Utility KW/H $             40,000.00 40000 $                     1.00
Model S Model X
Units=(A) 4000 20000
Direct Material $                  42,000.00 $             54,000.00
Direct Labor $                  24,000.00 $             40,000.00
Machine Setup(200*$90) for Model S,(240*$90) for Model X $                  18,000.00 $             21,600.00
Material Handling(1000*$5) for Model S,(3000*$5) for Model X $                    5,000.00 $             15,000.00
Utiltiy(2000*$1) for Model S,(4000 *$1) for Model X $                    2,000.00 $               4,000.00
Total Cost=(B) $                  91,000.00 $         1,34,600.00
Cost per unit=(B)/(A) $                          22.75 $                        6.73

Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Transcribed Image Text

Background: ElonMusk, the man who is responsible for revolutionizing the automotivespace is confused. Why you ask?He met with Ms. Static whoexplained to him that under the current allocation system,engineering costs amount to $46,880 per Model S and $15,630 perModel X. Elon responds:"How - Look at the Model X -its freaking awesome and is insanely over engineered. How can itcost leass than our base model?" he decides to hire you as aconsultant to drive transperency into the costs …Problem: Develop ABC to clearthe mess upCost PoolActivity CostsCost DriverDriverMachine Setup$                      360,000Setup Hours                            4,000Materials Handling$                      100,000Material (lbs)                          20,000Utility$                        40,000Kw/hr                          40,000Information by ProductModel SModel XUnits                             4,000                  20,000Direct Materials$                        42,000$               54,000Direct Labor$                        24,000$               40,000Setup Hours                                200                       240Materials                             1,000                    3,000Kw/Hr                             2,000                    4,000iiWhat / How do you suspect Ms. Static arrived at hernumbers?

Other questions asked by students