Question

Physics

image

At a hydroelectric power plant the water pressure head is at a height of 300 m and the water flow available is 100 m s If the turbine generator efficiency is 60 estimate the electric power available from the plant g 9 8 ms 2 A small town with a demand of 800 kW of electric power at 220 V is situated 15 km away from an electrie plant generating power at 440 V The resistance of the two wire line carrying power is 0 5 Q per km The town gets power from the line through a 4000 220 V step down transformer at a sub station in the town a Estimate the line power loss in the form of heat b How much power must the plant supply assuming there is negligible power loss due to leakage c Characterise the step up transformer at the plant Do the same exercise as above with the replacement of the earlier transformer by a 40 000 220 V step down transformer Neglect as hefore leakage losses though this may not be a good assumption voltage transmission involved

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students