Answer the following question:
a) What is the main difference between the CM and CM at riskcontracts?
b) Write the general format (equation) for each type of thenegotiated contract
c) If free float = 6 and total float = 5, explain the meaning ofthese 2 numbers?
d) How to prepare the detailed Estimate?
e) During what period a contractor can withdraw the bid withoutpenalty?
f) What is the project triangle? Explain the effect of increase ofeach one on the others?
g) What are the main steps used to estimate the total projectcost?
h) List the four items that need to be identified when planning forWBS?