Accounting

Activity-based costing problem

Factory A produces golf carts. One of its plants in Texasproduces two versions of carts: a basic model and a deluxe model.The deluxe model has a sturdier frame, a higher horsepower engine,bigger tires, and softer seats. At the beginning of the year, thefollowing data were prepared by the controller’s office for thisTexas plant:

                                                                                       Basic                        Deluxe

Expected Quantity toProduce                        20,000carts                10,000 carts

SellingPrice                                                               $1,800                      $ 3,600

Direct Material Cost                                                  $    500                      $ 1,000

Direct LaborCost                                                       $    300                      $     600

MachineHours                                                             1,000                          3,000

Direct LaborHours                                                    10,000                      10,000

Activity Center (Cost Driver)

Engineering Support(Hours)                                        1,500                          4,500

Receiving (OrdersProcessed)                                          300                             500

Material Handling (Number ofMoves)                        2,000                          4,000

Purchasing (Number ofOrders)                                      100                             200

Maintenance (Machine HoursUsed)                            1,000                          3,000

Paying Suppliers (InvoicesProcessed)                            250                             500

Equipment Setups (Number ofSetups)                              20                               60

Total overhead costs of $6,000,000 associated with activitycenters are reported as:

MaintainingEquipment                                              $ 1,140,000

EngineeringSupport                                                  $ 1,200,000

MaterialHandling                                                      $ 1,200,000

Setting UpEquipment                                                $    960,000

PurchasingMaterials                                                  $    600,000

ReceivingGoods                                                        $    400,000

PayingSuppliers                                                        $    300,000

Providing FacilitySpace                                            $    200,000

Facility-level costs are allocated on basis of machine hoursused . This provides a measure of time the facility is used by eachproduct.

Requirements:

Calculate the cost to produce each type of cart usingdirect labor hours as basis to allocate overheadcosts.

Calculate the cost to produce each type of cart usingactivity-based-costing.

Explain the difference in the costs using the twodifferent accounting systems. Provide appropriate supportingquantitative analysis.

Answer & Explanation Solved by verified expert
4.3 Ratings (654 Votes)
Calculate the cost to produce each type of cart using direct labor hours as basis to allocate overhead costs Traditional overhead rate Total overhead cost total direct labor hours 6000000 20000 300 per direct labor hour Manufacturing Cost per unit Basic Deluxe Direct material cost 500 1000 Direct labor cost 300 600 Manufacturing OH 150 300 Total Manuf Cost 950 1900 10000 x 30020000 150 10000 x 30010000 300 Calculate the cost to    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Transcribed Image Text

In: AccountingActivity-based costing problemFactory A produces golf carts. One of its plants in Texasproduces two...Activity-based costing problemFactory A produces golf carts. One of its plants in Texasproduces two versions of carts: a basic model and a deluxe model.The deluxe model has a sturdier frame, a higher horsepower engine,bigger tires, and softer seats. At the beginning of the year, thefollowing data were prepared by the controller’s office for thisTexas plant:                                                                                       Basic                        DeluxeExpected Quantity toProduce                        20,000carts                10,000 cartsSellingPrice                                                               $1,800                      $ 3,600Direct Material Cost                                                  $    500                      $ 1,000Direct LaborCost                                                       $    300                      $     600MachineHours                                                             1,000                          3,000Direct LaborHours                                                    10,000                      10,000Activity Center (Cost Driver)Engineering Support(Hours)                                        1,500                          4,500Receiving (OrdersProcessed)                                          300                             500Material Handling (Number ofMoves)                        2,000                          4,000Purchasing (Number ofOrders)                                      100                             200Maintenance (Machine HoursUsed)                            1,000                          3,000Paying Suppliers (InvoicesProcessed)                            250                             500Equipment Setups (Number ofSetups)                              20                               60Total overhead costs of $6,000,000 associated with activitycenters are reported as:MaintainingEquipment                                              $ 1,140,000EngineeringSupport                                                  $ 1,200,000MaterialHandling                                                      $ 1,200,000Setting UpEquipment                                                $    960,000PurchasingMaterials                                                  $    600,000ReceivingGoods                                                        $    400,000PayingSuppliers                                                        $    300,000Providing FacilitySpace                                            $    200,000Facility-level costs are allocated on basis of machine hoursused . This provides a measure of time the facility is used by eachproduct.Requirements:Calculate the cost to produce each type of cart usingdirect labor hours as basis to allocate overheadcosts.Calculate the cost to produce each type of cart usingactivity-based-costing.Explain the difference in the costs using the twodifferent accounting systems. Provide appropriate supportingquantitative analysis.

Other questions asked by students