A road is built with a vertical transition curve. The PVC is at 111+05 and elevation...

90.2K

Verified Solution

Question

Civil Engineering

A road is built with a vertical transition curve. The PVC is at111+05 and elevation of 322. The PVI is at 111+85 and elevation of320. Low point of curve is at 111+65.

Find starting grade? Ending grade? Design speed of curve?Elevation of low point on curve?

Answer & Explanation Solved by verified expert
4.4 Ratings (926 Votes)