Transcribed Image Text
A project's base case or most likely NPV is $44,000, and assumeits probability of occurrence is 50%. Assume the best case scenarioNPV is 65% higher than the base case and assume the worst scenarioNPV is 35% lower than the base case. Both the best case scenarioand the worst case scenario have a 25% probability of occurrence.Find the project's coefficient of variation. Enter youranswer rounded to two decimal places. For example, if your answeris 123.45% or 1.2345 then enter as 1.23 in the answer box.
Other questions asked by students
Let x = (1,1) and y = (3,1). 1. Find an explicit hyperbolic isometry f that...
UT 2 T 3 Given log54 x and log53 y determine an expression for logs...
The path of a satellite orbiting the earth causes the satellite to pass directly over...
Cast Iron Grills, Inc., manufactures premium gas barbecue grills. The company reports inventory...
On April 14, a company lends $10,000 cash to one of its employees and accepts...
Qu efecto tendr el siguiente asiento de diario de ajuste en los registros contables? Gasto...