A project's base case or most likely NPV is $44,000, and assumeits probability of occurrence is 50%. Assume the best case scenarioNPV is 65% higher than the base case and assume the worst scenarioNPV is 35% lower than the base case. Both the best case scenarioand the worst case scenario have a 25% probability of occurrence.Find the project's coefficient of variation.  Enter youranswer rounded to two decimal places. For example, if your answeris 123.45% or 1.2345 then enter as 1.23 in the answer box.