A product consists of three manufactured parts with one operation each. Material for each part...
80.2K
Verified Solution
Question
Accounting
A product consists of three manufactured parts with one operation each. Material for each part needs to be ordered, received and inspected. The parts are assembled into the final product, inspected, and packed. Order processing, scheduling and accounting are required per batch. R&D and engineering costs are apportioned to each unit produced. An order for 250 of the product is received. A summary of the ABC cost estimate for the batch is shown. Activity Cost Basis Hourly Rate Cost // Activity Log Order 1// batch $250.00 Schedule 1// batch 176.00 Order Material 3// batch 125.38 Receive Material 3// batch 121.41 Inspect Material 3// batch 287.43 Set-up Part A 4hr// batch $18.65 Set-up Part B 7.35hr// batch 23.88 Set-up Part C
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
- Unlimited Question Access with detailed Answers
- Zin AI - 3 Million Words
- 10 Dall-E 3 Images
- 20 Plot Generations
- Conversation with Dialogue Memory
- No Ads, Ever!
- Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Other questions asked by students
StudyZin's Question Purchase
1 Answer
$0.99
(Save $1 )
One time Pay
- No Ads
- Answer to 1 Question
- Get free Zin AI - 50 Thousand Words per Month
Best
Unlimited
$4.99*
(Save $5 )
Billed Monthly
- No Ads
- Answers to Unlimited Questions
- Get free Zin AI - 3 Million Words per Month
*First month only
Free
$0
- Get this answer for free!
- Sign up now to unlock the answer instantly
You can see the logs in the Dashboard.