A new highway is to be constructed. Design A calls for...

50.1K

Verified Solution

Question

Accounting

image

A new highway is to be constructed. Design A calls for a concrete pavement costing $70 per foot with a 12-year life; two paved ditches costing $3 per foot each; and three box culverts every mile, each costing $10,000 and having a 12-year life. Annual maintenance will cost $1,800 per mile; the culverts must be cleaned every three years at a cost of $300 each per mile. Design B calls for a bituminous pavement costing $30 per foot with a 6 -year life; three sodded ditches costing $1.30 per foot each; and two pipe culverts every mile, each costing $2,300 and having a 6-year life. The replacement culverts will cost $2,400 each. Annual maintenance will cost $2,700 per mile; the culverts must be cleaned yearly at a cost of $220 each per mile; and the annual ditch maintenance will cost $1.45 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 12-year period. Find the most economical design on the basis of AW and PW if the MARR is 12% per year. Click the icon to view the interest and annuity table for discrete compounding when the MARR is 12% per year

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students