A mud logger places a sample of calcium carbide in the drillstring when a connection is...

50.1K

Verified Solution

Question

Mechanical Engineering

A mud logger places a sample of calcium carbide in thedrillstring when a connection is made. The calcium carbide reactswith the mud to form acetylene gas. The acetylene gas is detectedby a gas detector at the shale shaker after pumping 4, 500 strokes.The drill string is composed of 9, 500 ft of 5-in, 19.5-lbm/ftdrill pipe and 500 ft of drill collars having an ID of 2.875 in.The pump is a double acting duplex pump with 6 in liners, 2-inrods, and 14 in strokes and operates in a volumetric efficiency of80%.

a.Estimate the pump cycle required to move the gas from thesurface to the bit.

b.Estimate the number of pump cycles required to move the gasfrom the bit to the shale shaker.

c.If the penetration rate of the bit is 20 ft/hr and the pumpspeed is 60 cycle/min, how many feet are drilled by the bit beforethe formation gas expelled from the rock destroyed by the bittravels from the bit from the surface?

(with steps please)

Answer & Explanation Solved by verified expert
4.0 Ratings (412 Votes)
question b Q The number of pump cycles required to move the gas from bit to shaleshaker ANSWER Given Total Strokes 4500    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students