a. If a pipe has failed a MIT, what measures can be done next.

b.What follow-up treatment could be required for the MIT failedpipe? Give two.

c. Christmas tree provides both surface pressure control andflow line control’ How this is possible?

d. On opening the gate valve, the flow path is enlarged in ahighly nonlinear manner with respect to the opening. Why?

e. Give other shut off applications in oil industry, where ballvalves can be used.

Answer & Explanation Solved by verified expert
3.7 Ratings (325 Votes)
a If a pipe failed in MIT measures can be taken as follows 1Appropriate monitoring facilities and safety sytem should be provided 2 Safety zones in both side of the pipeline 3Increase pipe wall thickness 4Protection from damage eg burying the    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students