A highway contractor has opened a cut in fine silty sand (SM). Because of the cut...

80.2K

Verified Solution

Question

Civil Engineering

A highway contractor has opened a cut in fine silty sand (SM).Because of the cut location and lack of drainage, surface water hasdrained into the cut, leaving the material very wet. Rubber-tiredscrapers are hauling material from the cut to an adjacent fill. Thematerial is being placed in the fill in 20 to 25cm lifts andcompacted by heavy sheep foot roller towed by a crawler tractor. Itis apparent that the specified compaction (95% of standard AASHTOdensity) is not being attained. The sheep foot roller not “walkingout and scraper tires are causing the compaction problem? Whatwould you suggest to the constructor to improve the compactionprocess? Ideally, concrete should be poured at temperatures between16°C and 38°C.

Answer & Explanation Solved by verified expert
4.0 Ratings (488 Votes)
    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students