A component requires two (2) operations to complete it. The first operation has the following information:...

70.2K

Verified Solution

Question

Mechanical Engineering

A component requires two (2) operations to complete it. Thefirst operation has the following information: Machining Time =2.445 min., Handling Time = 1.334 min., Tool Change Time = 21.45min. which needs to be changed every 1675 pieces with a Tool Costof $133.00 per tool. The operational cost for the first operation =$116.67 per hour. The second operation has the followinginformation: Machining Time = 1.436 min., Handling Time = 0.849min., Tool change Time = 18.75 min. which needs to be changed every970 pieces with a Tool Cost of $68.40 per tool. The operationalcost for the second operation = $116.67 per hour. What is the totalCost for the component?

Answer & Explanation Solved by verified expert
4.1 Ratings (644 Votes)
    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students