A. At the high point of the relevant range, labour hours atBradco Restoration were 10,000 and wages were $22,500. At the lowpoint of the relevant range, labour hours were 7,500 and wages were$17,500.

Using the high-low method determine the slope coefficient perlabour hour at Bradco Restoration?

B. At the high point of the relevant range, labour hours atBradco Restoration were 10,000 and wages were $22,500. At the lowpoint of the relevant range, labour hours were 7,500 and wages were$17,500.

Using the high-low method determine the fixed costs at BradcoRestoration?

C.At the high point of the relevant range, labour hours atBradco Restoration were 10,000 and wages were $22,500. At the lowpoint of the relevant range, labour hours were 7,500 and wages were$17,500.

What is the high-low estimate of the labour costs at BradcoRestoration when 8,000 hours are used?

Answer & Explanation Solved by verified expert
4.4 Ratings (906 Votes)

  • All working forms part of the answer
  • Working

Labor hours

Wages

High Level

                          10,000

$                   22,500.00

Low Level

                            7,500

$                   17,500.00

Difference

                            2,500

$                     5,000.00

  • Requirement ‘a’ = $ 2 per labor hour

Difference in Cost

$                                                               5,000.00

Difference in wages

                                                                        2,500

Wages per hour

$                                                                       2.00

  • Requirement ‘b’ = $ 2,500

Working

High Level

Low Level

A

Total wages

$                 22,500.00

$                   17,500.00

B

Total hours

10000

7500

C

Variable cost per hour

$                           2.00

$                             2.00

D = B x C

Total Variable cost

$                 20,000.00

$                   15,000.00

E = A - D

Total Fixed Cost

$                   2,500.00

$                     2,500.00

  • Requirement ‘c’

Estimated Labor cost at 8000 labor hours = $ 2500 fixed cost + ($2 x 8000 labor hours)
= 2500 + 16000
= $ 18,500 = Answer


Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Transcribed Image Text

In: AccountingA. At the high point of the relevant range, labour hours atBradco Restoration were 10,000...A. At the high point of the relevant range, labour hours atBradco Restoration were 10,000 and wages were $22,500. At the lowpoint of the relevant range, labour hours were 7,500 and wages were$17,500.Using the high-low method determine the slope coefficient perlabour hour at Bradco Restoration?B. At the high point of the relevant range, labour hours atBradco Restoration were 10,000 and wages were $22,500. At the lowpoint of the relevant range, labour hours were 7,500 and wages were$17,500.Using the high-low method determine the fixed costs at BradcoRestoration?C.At the high point of the relevant range, labour hours atBradco Restoration were 10,000 and wages were $22,500. At the lowpoint of the relevant range, labour hours were 7,500 and wages were$17,500.What is the high-low estimate of the labour costs at BradcoRestoration when 8,000 hours are used?

Other questions asked by students