Transcribed Image Text
5. One of the three traffic control improvement must be done.Conduct a B/C analysis and identify which one is favored. Theimprovement will be required for the foreseeable future. Use aninterest rate of 6.50%. The current situation is estimated to haveannual accident costs of 62,000. Option A B C Installed Cost110,000 90,000 140,000 Annual Repair, operating cost 8,000 6,0005,000 Estimated Annual Accident Cost Under Option 23,000 28,00030,000 Estimated Annual Travel time cost increase 10,000 9,0004,500 Life (yrs) 14 10 18a. What is the annual accident reduction benefit from optionB?b. What is the B/C ratio of option C?c. What is the B/C for the difference between option A andC?d. Complete the analysis for all options and based on theanalysis which option is the best public investment?
Other questions asked by students
Please explain the following statement. Assume that a contract for the sale of goods is modified....
Transgender rights is a very delicate topic in today’s society. What is a hypothesis related to...
A solid cylinder has mass M radius R and length e Its moment of inertia...
632 people were surveyed in all 310 of the people own a cat 134 of...
2 Use logarithms to evaluate 6 13 15 03 What is the answer A 0...