5. Given the following cost expenditures (see Table P6.3) for a small bridge job to...

60.1K

Verified Solution

Question

Accounting

image

image

5. Given the following cost expenditures (see Table P6.3) for a small bridge job to include direct and indirect charges (but not bank interest): A. Calculate the peak financial requirement. B. Sketch a diagram of the overdraft profile. Assumptions: The markup for this project is 8%. Finance charge is 1% per month. Retainage is 6% throughout project. Payments are billed at the end of the month, and are received one month later. Table P6.3 Monthly Costs for Bridge Job Month Monthly cost 1 29.000 2 48.900 3 16,400 Direct cost + indirect cost Table P6.3 Project Bar Chart Month Activity 1 2 3 4 5 1. Survey $2,000 2. Mobilization $1,200 3. Trench $3,000 $6,000 4. Lay pipe $3,000 5. Concrete S500 $500 6. Backfill $500 7. Move out S500 8. Prepare valves $1,000 9. Install valves $1.000 10. Test $1.500 95 5. Given the following cost expenditures (see Table P6.3) for a small bridge job to include direct and indirect charges (but not bank interest): A. Calculate the peak financial requirement. B. Sketch a diagram of the overdraft profile. Assumptions: The markup for this project is 8%. Finance charge is 1% per month. Retainage is 6% throughout project. Payments are billed at the end of the month, and are received one month later. Table P6.3 Monthly Costs for Bridge Job Month Monthly cost 1 29.000 2 48.900 3 16,400 Direct cost + indirect cost Table P6.3 Project Bar Chart Month Activity 1 2 3 4 5 1. Survey $2,000 2. Mobilization $1,200 3. Trench $3,000 $6,000 4. Lay pipe $3,000 5. Concrete S500 $500 6. Backfill $500 7. Move out S500 8. Prepare valves $1,000 9. Install valves $1.000 10. Test $1.500 95

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students