1-The following list of readings were taken in sequence during a levelling survey: Readings (m):    1.163, 2.592,...

60.1K

Verified Solution

Question

Civil Engineering

1-The following list of readings weretaken in sequence during a levelling survey:

Readings (m):    1.163, 2.592, 3.616, 0.778,2.348, 1.838, 2.469, 1.666, 2.893, 1.594   

The level instrument was moved after the fifth and eighthreadings.

Required:

(i) Fill in the leveling table and find the RLs of allpoints.

(RL of the first observed point = 105.00m). Use R & F methodand check using HCI method. Apply arithmetic check in bothcases.

*Please solve it by detail.

Answer & Explanation Solved by verified expert
4.3 Ratings (804 Votes)
    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students