1. Single plantwide factory overhead rate The total factory overhead for Bardot Marine Company is...
60.1K
Verified Solution
Link Copied!
Question
Accounting
1. Single plantwide factory overhead rate
The total factory overhead for Bardot Marine Company is budgeted for the year at $600,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboat and bass boat each require 12 direct labor hours for manufacture. Each product is budgeted for 250 units of production for the year. Determine (A) the total number of budgeted direct labor hours for the year, (B) the single plantwide factory overhead rate, and (C) the factory overhead allocated per unit for each product using the single plantwide factory overhead rate.
2. Multiple Production Department Factory Overhead Rates
The total factory overhead for Bardot Marine Company is budgeted for the year at $600,000 divided into two departments: Fabrication, $420,000, and Assembly, $180,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require 8 direct labor hours in Fabrication and 4 direct labor hours in Assembly. The bass boats require 4 direct labor hours in Fabrication and 8 direct labor hours in Assembly. Each product is budgeted for 250 units of production for the year. Determine (A) the total number of budgeted direct labor hours for the year in each department, (B) the departmental factory overhead rates for both departments, and (C) the factory overhead allocated per unit for each product using the department factory overhead allocation rates.
3. Activity-based costing: factory overhead costs
The total factory overhead for Bardot Marine Company is budgeted for the year at $600,000, divided into four activities: fabrication, $204,000; assembly, $105,000; setup, $156,000; and inspection, $135,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The activity-base usage quantities for each product by each activity are as follows:
Each product is budgeted for 250 units of production for the year. Determine (A) the activity rates for each activity and (B) the activity-based factory overhead per unit for each product.
To solve these problems we need to go through each part stepbystep 1 Single Plantwide Factory Overhead Rate A Total number of budgeted direct labor hours for the year Each boat speedboat and bass boat requires 12 direct labor hours Each product is budgeted for 250 units textTotal direct labor hours 12 texthoursboat times 250 textboats times 2 textproducts 6000 texthours B Single plantwide factory overhead rate Total factory overhead 600000 Total direct labor hours 6000 textOverhead rate
See Answer
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!